DOI News


Drilling of Relief Well Continues


08/01/2010


 

 Key contact numbers
  • Report oiled shoreline or request volunteer information: (866) 448-5816
  • Submit alternative response technology, services or products: (281) 366-5511
  • Submit your vessel for the Vessel of Opportunity Program: (866) 279-7983
  • Submit a claim for damages: (800) 440-0858
  • Report oiled wildlife: (866) 557-1401
Deepwater Horizon Incident
Joint Information Center

Phone: (713) 323-1670
(713) 323-1671


Prepared by the Joint Information Center
UPDATED August 1, 2010, 7:00 PM


* For a full timeline of the Administration-wide response, visit the White House Blog.

PAST 24 HOURS

Admiral Allen Provides an Update on the BP Oil Spill Response

National Incident Commander Admiral Thad Allen provided a briefing to inform the American public and answer questions on the administration-wide response to the BP oil spill. A full transcript is available here.

Admiral Allen reported on the progress of laying the final casing run in preparation for cementing in the relief well and reiterated the administration’s commitment to cleaning up impacted shorelines. "We continue to survey the entire area for tar balls, any type of oil. We continue to replace boom that was damaged during the recent storm and pick up absorbent boom that has oil on it and replace that with clean boom and we'll continue to do that," he said. "Our forces are standing by to attack oil wherever it may be located."

Drilling of the Relief Well Continues

Development Driller III is in the process of laying the final casing run, a necessary step before beginning the static diagnostics test—pumping mud and cement in through the top of the well—which will provide more information about well integrity and ultimately improves the probability of success for the relief well. The Q4000 is on-scene and ready for the static diagnostics test. Once the casing is set, the cementing of the relief well is expected to begin within four to five days. Development Driller II will hold operations and await results of the DDIII relief well.

Development Driller III has drilled the first relief well to a depth of 17,864 feet below the Gulf surface and Development Driller II has drilled the second relief well—a redundancy measure taken at the direction of the administration—to a depth of 15,963 feet below the surface.

Seismic and Acoustic Testing Continue to Ensure the Integrity of the Wellhead

In order to ensure the integrity of the wellhead and search for and respond to anomalies, the research vessel Geco Topaz and the NOAA Ship Henry R. Bigelow are conducting seismic and acoustic tests around the wellhead—part of continued efforts to use the best scientific tools available in response to the BP oil spill. The pressure in the wellhead continues to rise, demonstrating that it has integrity, and is currently at 6,980 pounds per square inch.

FWS Personnel Continue Wildlife Rescue and Recovery Missions Across the Region

The U.S. Fish and Wildlife Service excavated 145 Loggerhead sea turtle eggs from nests at the St. Vincent and St. Marks National Wildlife Refuges in Florida for transport to the Kennedy Space Center on Florida’s East Coast where they will be hatched and released.

From the Houma, La., Incident Command Post, 263 field personnel, 84 vessels and four helicopters and one float plane participated in reconnaissance and wildlife rescue and recovery missions. From the Mobile, Ala., Incident Command Post, wildlife recovery teams responded to 33 calls on the Wildlife Hotline. To report oiled wildlife, call (866) 557-1401.


By the Numbers to Date:

*The decrease in boom numbers since yesterday is due to the recovery of some displaced boom in Florida. Once recovered, this boom must be decontaminated, repaired, inspected, and certified before being staged or redeployed.