Getting Ready to Move!
The move into the 4th wing is scheduled to begin the end of April! Points of contact for each bureau/office/group moving into the 4th wing or out of the third wing have been identified, a Move Guide has been developed, move meetings have been scheduled and initiated, and the move contractor and space planner should be on board in March to provide assistance. As we move closer to the actual move date, a Town Meeting will be scheduled with each bureau/office/group to respond to questions and concerns and to ensure a smooth transition into the new space.
Each employee will be assisted by the space planner to ensure that the furniture layout for the new office space is appropriate, and that excess/surplus furniture is identified and tagged.
All packing materials will be supplied. Plastic crates with dollies will be distributed to each person in an effort to reduce the use of disposable packing materials. The crates are self-closing and do not require the use of tape. Crates can be stacked four high, labeled as to delivery location and easily moved on the dollies.
Personal items can be stored in a safe room during the move. A room will be designated for each bureau/office/group and will be available three days before the move and immediately after to retrieve items.
Back to Top 
Construction Update
Levels 4 -7:
Fully painted and carpeted.
Level 3:
Painting complete and carpet installation in process.
Level 2, 1 and Basement:
Mechanical, electrical, plumbing and architectural work on-going.
Gym: open
Cafeteria: scheduled to close upon completion of wing 4.
Health Center: to be temporarily located in the North Penthouse.
TOURS: Contact Junior Logan to
arrange a short group tour of your new space.
Back to Top 
Move Sequence and Space Assignment
Back to Top 
4th Wing Re-occupation
Recycle Green Room
For occupants moving in or out of space in the coming months, please work to reduce the amount of materials and supplies you will be moving. Start now by sorting and recycling files, office supplies, books, and office furniture. Contact the modernization program office (208-3919) if you have useable furniture so it can be offered to others. Recycling bins, for white and mixed paper can be requested by contacting the building managers office at 208-7560. Corrugated cardboard boxes should be broken down and placed in the hallways for pickup. Useable surplus office supplies will collected by the facilities manager’s office (208-7560). Supplies should neatly packed in boxes and labeled GREEN ROOM. Once packed, call facilities management (208-7560) to arrange for a pick-up.
Back to Top 
New Snack Bar to Open
A new snack bar, located on the east side of the main corridor at the 4th wing will open as occupants move back in the 4th wing. The snack bar will join Mickey’s, the current snack bar, in providing food service to occupants while the cafeteria is closed for renovation. The new snack bar will open in April. Watch for more news on food and services.
Back to Top 
What's new in the modernized space?
When you get into the modernized space, you will notice a number of changes.
- In the 4th wing, all of the kitchenettes are located on the East side.
- Drawer fronts have been added to the kitchen cabinetry.
- Refrigerators will be provided to ensure consistency in maintenance.
- New electrical panels and outlets have been installed.
- New fan coil units affording occupant regulation of heating and cooling have replaced older units.
- New telephones have been installed.
- Sink closets have been removed.
- Life safety systems have been upgraded.
Back to Top 
Meetings
For more information regarding the IAQ Forums and the TUG meetings, click here.
Back to Top 
|