Snack Bar Opens
Snack Bar Hours: Monday - Friday 7:00 AM - 4:00 PM
The new snack bar, located on the forth floor, just down the hall from Mickey’s Snack Bar, is open a ready for business. Occupants will be able to enjoy healthy food choices including: baked potatoes; a sandwich bar; pizza, a selection of juices, bottled and fountain beverages; prepackaged sandwiches and breakfast foods including fresh pastries, eggs, granola and protein bars; pretzels; fresh fruit; and a variety of chips, coffees and teas. Check out the new space, the stainless steel cases, coffee stations, track and fluorescent lighting, and linoleum flooring. Stop by and try something from the new menu!
Back to Top 
Construction Update
Floors 7-2:
DOI in possession
Floor 1:
DOI June 20, 2008
Stairs 40 - 43:
Final inspections
Credit Union: Under construction
North Penthouse: DOI mid June
Snack Bar: Open May 27, 2008
CLOSINGS: Cafeteria: May 30, 2008
TOURS: Contact Junior Logan (202) 501-8602
Back to Top 
4th Wing Re-occupation
Moves start on Friday, MAY 30, 2008 and will take place on the weekends to limit disruption to occupants!
The following groups will be moving into renovated space so check the Modernization Program Office Webpage for new locations and room numbers. NBC Directors Group, SFMB (Budget), OCIO, Solicitors, Mineral Management Service, Office of Inspector General, Office of Law Enforcement, BIA Help Desk, Credit Union, Office of Insular Affairs, Office of Environmental Policy and Compliance, Administrative Operations, NBC Audio, NBC Human Resources, Competitive Sourcing, DOIU-IT, Health Unit, Drug Program, Watch Office.
Back to Top 
New Safety Officer on Board!
The Modernization Program Office welcomes Steve D’Antoni to the MPO team and NBC. Steve holds an MS. in Industrial Engineering and Technology for Texas A&M with a concentration in Occupational Safety and Health Management. He has worked with the Department of Army, the Architect of the Capital and more recently, National Oceanic and Atmospheric Administration ( NOAA). Steve will be located in room 2507. So please stop by and welcome him when you get a chance.
Back to Top 
Telephone Training Available
Telephone training will be available for all groups that are moving into modernized space since new instruments are being provided. Your existing telephone should remain connected in your office and the NBC telecom technicians will do the relocation if required. All occupants moving into modernized space are encouraged to take time to participate in telephone training. To register for the training go to: https://doi1.ios.doi.gov/idvctrainingsignup.nsf.
If you do not have internet access, please call 202 208-3412 to register.
Back to Top 
Did You Know?
- Your new office space has adjustable air, heating, and lighting?
- There is a kitchenette in each wing of the modernized space?
- All new offices in wings 4, 5 and 6, will be retro-fit with blast mitigation blinds. Wings 3, 2 and 1 will have the blinds added during construction.
- Moves start on Friday nights and are completed by Monday morning?
Back to Top 
Meetings
For more information regarding the IAQ Forums and the TUG meetings, click here.
Back to Top 
|